Skip to content
Toggle navigation

Case studies

Filter by:

October 11, 2019

Bostik leads the way with Guide Dogs charity project

Bostik has donated a range of subfloor preparation products and flooring adhesives for use as part of a charitable initiative to improve the facilities at…

Continue reading
August 1, 2019

Bostik helps Dunstable Leisure Centre refurb go swimmingly

A variety of Bostik subfloor preparation products have been specified for the redevelopment of Dunstable Leisure Centre and Library, enabling optimal installation of various flooring…

Continue reading
Bostik_Smith’s Yard development Manchester
January 11, 2019

Bostik blossoms on latest residential development

A range of Bostik subfloor preparation and adhesive products have been used at a new residential development in Manchester to provide a faultless flooring finish.

Continue reading
St Gabriel's CofE exterior
May 25, 2018

Bostik gets top marks for flooring at new primary school development

Bostik has supplied a range of subfloor preparation and adhesive products for use at a primary school located within a new 1,200-acre urban development in…

Continue reading
Canning Town Development - Interior
May 11, 2018

Chelmer Group sticks with Bostik on London residential and leisure project

Professional flooring contractor, Chelmer Group, has specified a range of surface preparation products from Bostik for use at the new Hallsville Quarter development in Canning…

Continue reading
Swansea University - Chemistry Suite interior
March 13, 2018

Bostik provides the right formula for Swansea University chemistry labs

Bostik has been selected by commercial flooring contractor, Artisan Flooring, to provide subfloor preparation products as part of a £60 million refurbishment project at the…

Continue reading
Stratford Hospital Interior
December 14, 2017

Bostik’s subfloor preparation products pave the way at Stratford Hospital

Bostik has been selected by commercial flooring contractor, Pinnacle Flooring, to supply a range of subfloor preparation products to the new, £22million Stratford Hospital development.

Continue reading
University of Huddersfield Exterior
October 19, 2017

Bostik receives top marks for flooring at the University of Huddersfield

Titan Flooring was the main flooring contractor for the £27.5m development, which includes the new six-storey Oastler building that will house the University’s Law School…

Continue reading
Paddington Exchange
April 11, 2017

Bostik ensures a flawless finish at London residential development

Bostik has supplied a range of subfloor preparation products and adhesives to deliver a high quality flooring finish at the Paddington Exchange development in Paddington,…

Continue reading
Healing School
March 10, 2017

Bostik the complete solution for Lincolnshire Flooring in Healing School project

Bostik has been chosen by flooring specialist, Lincolnshire Flooring, to provide all sub floor preparation and adhesive products for a landmark project at Healing School…

Continue reading