Subfloor

Ambient temperatures & relative humidity
There are many factors that affect the installation of floor coverings in new build projects. Sites often lack windows and heating with multiple trades moving…
Continue reading
The importance of correct trowel notch size in floor covering installation
When installing floor coverings, selecting the correct trowel notch size for the chosen adhesive is a critical yet frequently disregarded consideration. The trowel notch size…
Continue reading
Bostik ensures a flawless finish at London residential development
Bostik has supplied a range of subfloor preparation products and adhesives to deliver a high quality flooring finish at the Paddington Exchange development in Paddington,…
Continue reading
Why it’s essential to prepare floors properly when a surface DPM is specified
It is regularly quoted, accurately, that moisture is the main cause of floor failures, and as a consequence, specifications offered by manufacturers will often incorporate…
Continue reading