curing times
Understanding drying times for levelling compounds
When considering flooring installations, levelling compounds play a pivotal role in preparing the surface ready for floorcoverings. Understanding the factors that influence drying and curing times can therefore help to reduce downtime on site, maximise productivity and ensure projects are completed to a high standard within the required timescales. Here I’ll discuss some of the factors that need to be considered when working with levelling compounds to ensure they dry and cure properly.
Continue reading